AWSS Pump Station 2 Modernization Project
Location
San Francisco, California
Owner
San Francisco Public Utilities Commission
Project Dates
2019 - 2022
Services Provided
Project Cost Control
Cost Estimating
Scheduling
TIA Review
PROJECT DESCRIPTION
Pumping Station No. 2 is a component of the Auxiliary Water Supply System (AWSS) high-pressure pipeline system for fire suppression, which was initially constructed following the 1906 San Francisco earthquake. The work includes structural improvements, installation of a new diesel generator, installation of associated ventilation and exhaust systems, domestic water system, gas piping, and related mechanical equipment, along with various electrical power system improvements and associated architectural improvements.
Dabri is providing CM services including project cost control, estimating, scheduling, TIA review, and change order review services during the construction phase as part of the integrated SFPUC PM/CM Team for this project.